Master Scheduler Job in Imagegrafix Software Solutions Pvt. Ltd

Master Scheduler

Apply Now
Job Summary
  • Responsible for entering and maintaining the detailed job plan data, (job steps, logic, resources, etc.) into Primavera P6 to develop the Turnaround Master Schedule
  • Perform Turnaround Scheduling
  • Responsible for performing schedule analysis to ensure that the process and procedures detailed in the Turnaround Work Scheduling Process have been applied.
  • Provide all necessary schedules to ensure the development of proper estimates and cost forecasts within a project stage.
  • Coordinate with TA Planner to develop the Turnaround schedule and logic path.
  • Responsible for coordinating with TA Planners to perform quality checks of schedule before entry to Primavera P6.
  • Responsible for issuing the required schedule and resource reports from Primavera.
  • Expert in various codes creation, assignment, resource loading/ assignment and levelling
  • Versed in generating reports related to pooled resources deployment/ utilization.
  • Responsible for preparing and distributing the look-ahead reports for the daily scheduling meetings.
  • Responsible for review, validation, and entry of actual/ field data into schedule for status updates utilising Primavera import features also.
  • Work inside the existing WBS structure and interface with Integrated Schedule
  • Expert in generating/ designing reports in Primavera in sync with daily reports required during Turnaround execution phase.
  • All safety, PSM and IIF ongoing initiatives shall be followed as per HSE department.
  • Daily report to the manager for the activity carried out and planning for the next day, and work as per instruction of the reporting manager

Experience Required :

Minimum 5 Years

Vacancy :

2 - 4 Hires

Apply Now